Commercial Interior Reconstruction and Finish Work
When included in the approved post-loss scope, interior reconstruction may involve ceilings, walls, flooring, doors, and other finish work managed under one accountable team.
Interior finish work depends on an approved scope and a project-specific sequence.
Existing materials may be unavailable, ownership may need to approve substitutions, and completed surfaces may need protection while later work proceeds. Those decisions should be documented before the affected installation begins.
No universal finish sequence applies across properties. The written scope, site conditions, materials, and required trades determine the order. TRC manages the approved rebuild; it does not promise a reopening or inspection result.
Document the existing finishes, confirm selections, and manage the approved work.
The written contract identifies work performed by TRC and work assigned to other trades. TRC manages the approved scope under one accountable team.
Record affected finishes.
Document the visible flooring, wall, ceiling, door, hardware, millwork, and fixture conditions relevant to the proposed loss-repair scope.
Confirm the approved scope and selections.
Ownership reviews available material selections and any documented substitutions. The carrier decides what it accepts under the policy.
Set the project sequence.
TRC manages a project-specific sequence for the approved ceiling, wall, flooring, door, fixture, and finish work. Completed work is protected as later activities proceed where the scope requires it.
Coordinate required licensed trades.
Licensed electricians and plumbers are brought in whenever the work requires it.
Document TRC's completed work.
TRC identifies the work it performed and the closeout records included in the scope. Workmanship coverage: 1-year workmanship warranty on work performed by TRC.
Finish items included only when identified in the approved rebuild.
Materials, trades, and approval boundaries.
TRC documents the existing material and presents available replacement information to ownership. Ownership selects the material, and the carrier decides what it accepts under the policy.
The written contract identifies work performed by TRC and work assigned to other trades. One accountable team manages the approved rebuild.
Accessibility- or code-related work must be identified in the approved scope or project documents. The applicable professionals and authorities determine their requirements and approvals.
Any owner-selected change should be documented and authorized separately from the carrier-reviewed loss scope. Carrier payment for that change depends on the policy and carrier decision.
TRC does not decide occupancy. Access and continued operation depend on the project conditions and restrictions imposed by the responsible owner, professionals, or authorities.