
Commercial Reconstruction Involving Structural Damage
We assess and document structural damage. Any required design, review, or approval remains with the responsible licensed professional or applicable authority.
Structural-damage work can involve several parties with different authority.
Reported structural damage may involve temporary stabilization, a repair design, construction work, and review by a licensed professional or public authority. Those roles should be identified in the written project scope.
We assess and document structural damage. TRC provides in-house shoring when it is included in an approved project scope. Shoring is temporary stabilization; it is not proof of permanent repair, structural safety, code approval, or permission to occupy.
Follow the approved documents and keep authority with the responsible party.
Engineering sign-off is case by case. When it is required, the responsible licensed professional provides it; TRC does not issue that approval.
Assess and document.
We assess and document structural damage for the proposed reconstruction scope.
Identify temporary stabilization.
TRC provides shoring when it is included in the approved scope. The responsible project parties determine the design, limits, access restrictions, and duration applicable to that stabilization.
Obtain required project direction.
When plans, calculations, or professional review are required, the responsible licensed professional supplies the project-specific direction. TRC does not issue that approval.
Manage approved reconstruction work.
TRC manages the work assigned to it under one accountable team. Licensed electricians and plumbers are brought in whenever the work requires it.
Document TRC's completed scope.
Project professionals and applicable authorities perform the reviews assigned to them. Workmanship coverage: 1-year workmanship warranty on work performed by TRC.
Structural-damage responsibilities are project-specific.
Who documents, designs, builds, and approves?
No. When a project requires licensed design or review, the responsible licensed professional provides it. TRC manages only the construction work assigned in the approved scope.
The licensed professional and applicable authority perform the reviews assigned to them. TRC does not issue structural, code, inspection, or occupancy approval.
No. TRC does not determine whether a damaged or shored area may be occupied. Follow restrictions and decisions issued by the owner, licensed professional, emergency officials, and applicable authority.
Coverage depends on the policy, cause of loss, and carrier decision. We document losses and coordinate with insurance carriers; we do not predict the coverage result.
Workmanship coverage: 1-year workmanship warranty on work performed by TRC. It is not a design approval, system warranty, or warranty for work performed by another party.
More on commercial reconstruction.
Discuss reconstruction involving structural damage.
Tell us what damage has been reported, whether temporary stabilization is present, and which project professionals are involved.